CLH provided landscape architecture design and civil engineering services for a master plan and new construction of Green Level High School. This school includes one softball field, one baseball field, two multi-purpose fields, six tennis courts, a track, and stadium facilities. CLH also worked with the Town of Cary on a greenway connection to the school.
CLH has extensive experience with the site design and permitting for educational facilities across North Carolina. Because these facilities have extensive parking (e.g., 750 – 1,100 spaces) for both daily and special event use, careful attention is given to signage, wayfinding, and stormwater management. As with Green Level High School, many include greenway connectors and detailed pedestrian plans to reduce conflicts between cars and pedestrians. Additionally, Green Level High School required extensive walls due to the steep terrain.
Tzu Chen Photography